Shopping Cart

0 Item(s)

Freezer Work Safe Work Method Statement

What Our Clients Are Saying...

-

We purchased a Safe Work Method Statement Template from BlueSafe Australia's Site and we were so happy with the quality we decided to place a bulk SWMS order. The quality was very high and the time we saved was enormous. The value your team has added, along with the fast service is 5 stars which is hard to find these days.

John McCarthy - National Operations Manager - Ausmart International - NSCA Member

 

We had purchased Occupational Health and Safety Procedures from other providers previously, however we weren’t completely satisfied with the quality of the documents provided. Once we had seen one of BlueSafe Australia’s documents however, we were happy with the quality. We’ve found BlueSafe Australia’s SWMS to be high quality, straight to the point and easy to use. Thanks again.

Sean Kerlin - Manager - Beehive Vinyl Products - Australian Lining Company Pty Ltd


Need a complete Safety Management System? Click Here to see our range of Safety Management Systems

Freezer Work Safe Work Method Statement

 

The Freezer Safe Work Method Statement is a comprehensive Safe Work Procedure which is detailed and pre-filled, ready for immediate use. This is NOT an empty template. 

References for the Freezer Safe Work Method Statement: 

The following codes, legislation and standards have been indexed as a reference guide for safe work when carrying out Freezer operations. The Freezer work Method Statement references in this procedure include, but are not limited to: 

  • AS/NZS 4474 Refrigerators and Freezers

 

The Freezer Work Safe Work Method Statement is a comprehensive safe work procedure that covers all safety requirements to be carried out while carrying out Freezer Work operations. The Freezer Work Safe Work Method Statement is pre-filled and editable, which means all the main safety aspects of Freezer Work have already been filled in for you. All you have to do is make sure that you assess the risks of your specific task, and then adjust the Freezer Work Safe Work Method Statement to suit. 

All our documents are delivered in Microsoft Word Format for easy editing, and each Safe Work Method Statement features a “before and after controls risk rating” which allows you to see how the control measures put in place actually reduce the risk associated with Freezer Work operations. Many companies don’t provide Safe Work Method Statements with this feature, however many larger companies, government organisations and contractors will require this format when gaining larger tenders or contracts. The Freezer Work Safe Work Method Statement Covers:

  1. Freezer Work operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered with Freezer Work operations
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Freezer Work safety measures and guides
  6. Operational Safety Checks
  7. Specific Personal Protective Equipment (PPE) to be used
  8. Before and After Risk Ratings while carrying out Freezer Work Operations
  9. Add a photo feature which allows you to add a photo of your task or  specific equipment
  10. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the Freezer Work Safe Work Method Statement

The Freezer Work Safe Work Method Statement is delivered in Microsoft Word format for easy editing and simple customisation by adding your company logo and details. Ordering is as easy as 1, 2, 3. On ordering, a download link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re done.

All our Safe Work Method Statements are high in quality and comprehensive, ranging anywhere from 3 pages to 15 pages long, depending on the related tasks or equipment. Although we make every effort to ensure our procedures are very comprehensive to save you the most amount of time and resources possible, there may be certain risks that relate to your specific workplace that may not be recognised. For this reason every procedure should be carefully read and any required amendments be made before implementing the Safe Work Method Statement into your workplace practices. 

Price: $ 120.00
Includes Gst

You might also like...

Contact Us

BlueSafe Online Pty Ltd

ABN 45 617 812 094

ACN 617 812 094

Phone:  1300 877 609 

support@bluesafesolutions.com.au

Read More

About Us

It's now been 7 years since we ventured out and started helping small business owners by providing effective WHS, Employee Management and Productivity Tools. Since then we have grown to a network of business owners and professionals of over 40 personnel.

Read More

Subscribe

Subscribe here for Monthly Specials, What's Hot Offers and Business Resources.

Got Questions? Let's have a chat.

Just leave us your name and your contact number and we'll call you right back.